Call Center Churubusco + PRODUCTORA
2013-01-27 00:00
架构师提供的文本描述。为了将呼叫中心的运营能力提高一倍,一座建筑被拆除,一座模块化的、低成本的建筑被用钢制薄膜封套在它的位置上。
Text description provided by the architects. In order to double the call center’s operating capacity, a building was demolished and a modular, low-cost building was raised in its place with a steel sheeting envelope.
© Paul Czitrom
(C)保罗·捷克特罗姆
为了控制光线进入建筑物的入口,立面的长垂直条与长玻璃条交替,在开放部分和封闭部分之间形成了平等的分隔。
To control the entrance of light into the building, long vertical strips of the façade were alternated with long glass strips, creating an equal division between the open and closed sections.
© Paul Czitrom
(C)保罗·捷克特罗姆
大门上的细节继续着整个门面的开放和封闭的逻辑,创造了一个没有改变的表面。
Detailing on the entrance doors continues with the open-closed logic of the entire façade, creating a surface without alterations.
© Paul Czitrom
(C)保罗·捷克特罗姆
长长的垂直开口的节奏提供了一种经典的美:典型的工业盒被转变成一个优雅和半透明的窗帘。
The rhythm of the long vertical openings provide the volume with a classic beauty: the typical industrial box is thus transformed into an elegant and translucent curtain.
First Floor Plan
一层平面图
推荐作品
下载